Renewable sitesDungannon Energy Storage System

Dungannon Energy Storage System

Dungannon Energy Storage System is under construction in Mid Ulster with a recorded capacity of 50 MW.

50 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Low Carbon Storage Ireland
Mid Ulster
Authority
Northern Ireland

Planning and build timeline

Application submitted2018-06-05
Permission grantednot recorded
Operationalnot recorded

Mid Ulster’s record on battery storage

Mid Ulster has decided 5 battery storage schemes and approved 100%, taking a median of 14.3 months. See every battery storage scheme decision in Mid Ulster

Other built sites within 15 km

SiteMWDistance
Granville Ecopark
Anaerobic Digestion · Operational
39.2 km
Tullywiggan Road
Anaerobic Digestion · Operational
112.9 km
Anaerobic Digestion Plant
Anaerobic Digestion · Operational
0.513.4 km

How big is Dungannon Energy Storage System?

Dungannon Energy Storage System has a recorded installed capacity of 50 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dungannon Energy Storage System?

REPD records the operator as Low Carbon Storage Ireland. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dungannon Energy Storage System approved and built?

The application was submitted on 2018-06-05. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7050.