Novarly ParcelRenewable sites

Renewable sitesDungannon Energy Storage System

Dungannon Energy Storage System

Dungannon Energy Storage System is a 50 MW battery storage site under construction in Mid Ulster. REPD does not record the planning grant date. Operator of record: Low Carbon Storage Ireland.

50 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Low Carbon Storage Ireland
Mid Ulster
Authority
Northern Ireland

Planning and build timeline

Application submitted5 June 2018
Permission grantednot recorded
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Mid Ulster approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Dungannon Energy Storage System’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Mid Ulster’s record on battery storage

Mid Ulster has decided 5 battery storage schemes and approved 100%, taking a median of 14.3 months. See every battery storage scheme decision in Mid Ulster

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
39.2 km
Anaerobic Digestion · Operational
112.9 km
Anaerobic Digestion · Operational
0.513.4 km

How big is Dungannon Energy Storage System?

Dungannon Energy Storage System has a recorded installed capacity of 50 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dungannon Energy Storage System?

REPD records the operator as Low Carbon Storage Ireland. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dungannon Energy Storage System approved and built?

The application was submitted on 5 June 2018. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7050.

Novarly Parcel · official public data, read properly · parcel.novarly.com