Trinity Hall Solar Farm is under construction in Central Bedfordshire with a recorded capacity of 15 MW.

15 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
European Energy Photovoltaics Limited
Central Bedfordshire
Authority
England

Planning and build timeline

Application submitted2021-02-11
Permission granted2021-05-05
3 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Central Bedfordshire’s record on solar

Central Bedfordshire has decided 32 solar farms and approved 97%, taking a median of 3.2 months. See every solar farm decision in Central Bedfordshire

Other built sites within 15 km

SiteMWDistance
Tebworth - Battery Storage
Battery · Under Construction
0.9 km
Tebworth - Solar Farm
Solar Photovoltaics · Under Construction
0.9 km
Trinity Hall Farm
Anaerobic Digestion · Operational
1.11.6 km
Manor Farm
Solar Photovoltaics · Operational
51.9 km
Double Arches Quarry Wind Turbine
Wind Onshore · Operational
1.55.1 km
Checkley Wood Farm
Wind Onshore · Operational
4.15.3 km
Church Farm
Solar Photovoltaics · Operational
6.25.8 km
Chapel Farm
Battery · Operational
49.56.1 km

How big is Trinity Hall Solar Farm?

Trinity Hall Solar Farm has a recorded installed capacity of 15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Trinity Hall Solar Farm?

REPD records the operator as European Energy Photovoltaics Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Trinity Hall Solar Farm approved and built?

The application was submitted on 2021-02-11. Permission was granted on 2021-05-05, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12623.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council