Stracathro Hospital Solar
Stracathro Hospital Solar is an operational 0.25 MW solar farm in Angus, generating since 31 July 2021. Planning permission was granted on 9 April 2021, 6 months after submission. Operator of record: Tayside Primary Care NHS Trust.
Planning and build timeline
| Application submitted | 5 October 2020 |
| Permission granted | 9 April 2021 6 months after submission |
| Operational | 31 July 2021 4 months after consent |
Screening a site of your own?
Angus approves 97% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Stracathro Hospital Solar’s recorded coordinate — swap in your own postcode or coordinates.
Angus’s record on solar
Angus has decided 30 solar farms and approved 97%, taking a median of 4 months. See every solar farm decision in Angus →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Under Construction | 1 | 12.9 km |
Wind Onshore · Operational | 10 | 14 km |
Hydrogen · Under Construction | 0.8 | 14.6 km |
Wind Onshore · Under Construction | 1 | 14.6 km |
Wind Onshore · Operational | 7.5 | 14.6 km |
Wind Onshore · Operational | 25 | 15 km |
How big is Stracathro Hospital Solar?
Stracathro Hospital Solar has a recorded installed capacity of 0.25 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Stracathro Hospital Solar?
REPD records the operator as Tayside Primary Care NHS Trust. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Stracathro Hospital Solar approved and built?
The application was submitted on 5 October 2020. Permission was granted on 9 April 2021, 6 months later. The site became operational on 31 July 2021, 4 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8233.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode