South of Henley Hall

South of Henley Hall is an operational 5 MW solar farm in Shropshire, generating since 17 March 2017. Planning permission was granted on 8 June 2016, 14 months after submission. Operator of record: NESF (formerly Kronos Solar (KS SPV39)).

5 MW
Capacity
as recorded in REPD
Operational
Status
since 17 March 2017
Solar Photovoltaics
Technology
NESF (formerly Kronos Solar (KS SPV39))
Shropshire
Authority
England

Planning and build timeline

Application submitted2 April 2015
Permission granted8 June 2016
14 months after submission
Operational17 March 2017
9 months after consent

Screening a site of your own?

RedlineUK · £39

Shropshire approves 94% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with South of Henley Hall’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Shropshire’s record on solar

Shropshire has decided 68 solar farms and approved 94%, taking a median of 3.2 months. See every solar farm decision in Shropshire

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
1.11.7 km
Solar Photovoltaics · Operational
0.56 km
Solar Photovoltaics · Under Construction
0.38.9 km
Solar Photovoltaics · Operational
4.513.3 km
Solar Photovoltaics · Operational
6.514.6 km

How big is South of Henley Hall?

South of Henley Hall has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates South of Henley Hall?

REPD records the operator as NESF (formerly Kronos Solar (KS SPV39)). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was South of Henley Hall approved and built?

The application was submitted on 2 April 2015. Permission was granted on 8 June 2016, 14 months later. The site became operational on 17 March 2017, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5136.