Renewable sites › Kerry Ingredients & Flavours - Solar Panels
Kerry Ingredients & Flavours - Solar Panels
Kerry Ingredients & Flavours - Solar Panels is under construction in Shropshire with a recorded capacity of 0.3 MW.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Shropshire’s record on solar
Shropshire has decided 68 solar farms and approved 94%, taking a median of 3.2 months. See every solar farm decision in Shropshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Land at High Point Farm Solar Photovoltaics · Operational | 4.5 | 7.4 km |
South of Henley Hall Solar Photovoltaics · Operational | 5 | 8.9 km |
Wigley Farm Anaerobic Digestion · Operational | 1.1 | 10.4 km |
Bromfield Sand and Gravel Solar Photovoltaics · Operational | 0.5 | 13.9 km |
How big is Kerry Ingredients & Flavours - Solar Panels?
Kerry Ingredients & Flavours - Solar Panels has a recorded installed capacity of 0.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Kerry Ingredients & Flavours - Solar Panels?
REPD records the operator as Big Solar Co-op. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Kerry Ingredients & Flavours - Solar Panels approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14068.