Novarly ParcelRenewable sites

Renewable sitesSoay Solar Farm and Greener Grid Park

Soay Solar Farm and Greener Grid Park

Soay Solar Farm and Greener Grid Park is under construction in East Riding of Yorkshire with a recorded capacity of 49.99 MW.

49.99 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Statkraft Uk Limited
East Riding of Yorkshire
Authority
England

Planning and build timeline

Application submitted2022-01-26
Permission granted2022-11-28
10 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Riding of Yorkshire’s record on solar

East Riding of Yorkshire has decided 57 solar farms and approved 100%, taking a median of 2.2 months. See every solar farm decision in East Riding of Yorkshire

Other built sites within 15 km

SiteMWDistance
Soay Solar Farm and Greener Grid Park
Battery · Under Construction
2000 km
Gallymoor Landfill
Landfill Gas · Operational
2.98.6 km
Spaldington Airfield
Wind Onshore · Operational
12.512.4 km
Sancton Hill
Wind Onshore · Operational
1014.7 km

How big is Soay Solar Farm and Greener Grid Park?

Soay Solar Farm and Greener Grid Park has a recorded installed capacity of 49.99 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Soay Solar Farm and Greener Grid Park?

REPD records the operator as Statkraft Uk Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Soay Solar Farm and Greener Grid Park approved and built?

The application was submitted on 2022-01-26. Permission was granted on 2022-11-28, 10 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9014.