Novarly ParcelRenewable sites

Renewable sitesRothiesholm

Rothiesholm

Rothiesholm is an operational 2.7 MW onshore wind farm in Orkney Islands, generating since 10 April 2002. Planning permission was granted on 1 May 2001, 4 months after submission. Operator of record: Longearth Ltd / Farm Energy.

2.7 MW
Capacity
as recorded in REPD
Operational
Status
since 10 April 2002
Wind Onshore
Technology
Longearth Ltd / Farm Energy
Orkney Islands
Authority
Scotland

Planning and build timeline

Application submitted1 January 2001
Permission granted1 May 2001
4 months after submission
Operational10 April 2002
11 months after consent

Screening a site of your own?

RedlineUK · £39

Orkney Islands approves 93% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Rothiesholm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Orkney Islands’s record on onshore wind

Orkney Islands has decided 28 onshore wind schemes and approved 93%, taking a median of 6.2 months. See every onshore wind scheme decision in Orkney Islands

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
2.70 km
Tidal Stream · Operational
29.6 km
Tidal Stream · Operational
29.6 km
Wind Onshore · Operational
1010.4 km

How big is Rothiesholm?

Rothiesholm has a recorded installed capacity of 2.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rothiesholm?

REPD records the operator as Longearth Ltd / Farm Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rothiesholm approved and built?

The application was submitted on 1 January 2001. Permission was granted on 1 May 2001, 4 months later. The site became operational on 10 April 2002, 11 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3529.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode