Novarly ParcelRenewable sites

Renewable sitesBu Farm

Bu Farm

Bu Farm is an operational 2.7 MW onshore wind farm in Orkney Islands, generating since 10 May 2002. REPD does not record the planning grant date. Operator of record: Longearth Ltd/ Farm Energy.

2.7 MW
Capacity
as recorded in REPD
Operational
Status
since 10 May 2002
Wind Onshore
Technology
Longearth Ltd/ Farm Energy
Orkney Islands
Authority
Scotland

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational10 May 2002

Screening a site of your own?

RedlineUK · £39

Orkney Islands approves 93% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bu Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Orkney Islands’s record on onshore wind

Orkney Islands has decided 28 onshore wind schemes and approved 93%, taking a median of 6.2 months. See every onshore wind scheme decision in Orkney Islands

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
2.70 km
Tidal Stream · Operational
29.6 km
Tidal Stream · Operational
29.6 km
Wind Onshore · Operational
1010.4 km

How big is Bu Farm?

Bu Farm has a recorded installed capacity of 2.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bu Farm?

REPD records the operator as Longearth Ltd/ Farm Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bu Farm approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 10 May 2002.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4008.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode