Novarly ParcelRenewable sites

Renewable sitesSR-2000 (FoW - EMEC)

SR-2000 (FoW - EMEC)

SR-2000 (FoW - EMEC) is operational in Scottish Government (S36) with a recorded capacity of 2 MW, and has been generating since 2017-04-14.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-04-14
Tidal Stream
Technology
Scotrenewables
Scottish Government (S36)
Authority
Scotland

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2017-04-14

Other built sites within 15 km

SiteMWDistance
Magallanes (FoW - EMEC)
Tidal Stream · Operational
20 km
Spurness Wind Farm Repowering
Wind Onshore · Operational
108.5 km
Rothiesholm
Wind Onshore · Operational
2.79.6 km
Bu Farm
Wind Onshore · Operational
2.79.6 km

How big is SR-2000 (FoW - EMEC)?

SR-2000 (FoW - EMEC) has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates SR-2000 (FoW - EMEC)?

REPD records the operator as Scotrenewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was SR-2000 (FoW - EMEC) approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2017-04-14.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2402.

Novarly Parcel · official public data, read properly · parcel.novarly.com