Rothes Wind Farm (Extension) (II)

Rothes Wind Farm (Extension) (II) is an operational 41.4 MW onshore wind farm in Moray, generating since 15 April 2013. Planning permission was granted on 12 January 2010, 25 months after submission. Operator of record: Fred Olsen Renewables.

41.4 MW
Capacity
as recorded in REPD
Operational
Status
since 15 April 2013
Wind Onshore
Technology
Fred Olsen Renewables
Moray
Authority
Scotland

Planning and build timeline

Application submitted10 December 2007
Permission granted12 January 2010
25 months after submission
Operational15 April 2013
39 months after consent

Screening a site of your own?

RedlineUK · £39

Moray approves 77% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Rothes Wind Farm (Extension) (II)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Moray’s record on onshore wind

Moray has decided 13 onshore wind schemes and approved 77%, taking a median of 16.4 months. See every onshore wind scheme decision in Moray

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
50.60 km
Biomass (dedicated) · Operational
8.39.4 km
Wind Onshore · Operational
489.6 km
Biomass (dedicated) · Operational
12.510.4 km
Wind Onshore · Operational
66.712.1 km
Wind Onshore · Operational
6512.2 km

How big is Rothes Wind Farm (Extension) (II)?

Rothes Wind Farm (Extension) (II) has a recorded installed capacity of 41.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rothes Wind Farm (Extension) (II)?

REPD records the operator as Fred Olsen Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rothes Wind Farm (Extension) (II) approved and built?

The application was submitted on 10 December 2007. Permission was granted on 12 January 2010, 25 months later. The site became operational on 15 April 2013, 39 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3951.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode