Novarly ParcelRenewable sites

Renewable sitesHill of Towie (Drummuir)

Hill of Towie (Drummuir)

Hill of Towie (Drummuir) is an operational 48 MW onshore wind farm in Moray, generating since 1 June 2012. Planning permission was granted on 11 November 2003, 12 months after submission. Operator of record: Renewable Energy Systems (RES).

48 MW
Capacity
as recorded in REPD
Operational
Status
since 1 June 2012
Wind Onshore
Technology
Renewable Energy Systems (RES)
Moray
Authority
Scotland

Planning and build timeline

Application submitted15 November 2002
Permission granted11 November 2003
12 months after submission
Operational1 June 2012
103 months after consent

Screening a site of your own?

RedlineUK · £39

Moray approves 77% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Hill of Towie (Drummuir)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Moray’s record on onshore wind

Moray has decided 13 onshore wind schemes and approved 77%, taking a median of 16.4 months. See every onshore wind scheme decision in Moray

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
50.69.6 km
Wind Onshore · Operational
41.49.6 km
Biomass (dedicated) · Operational
8.313.4 km

How big is Hill of Towie (Drummuir)?

Hill of Towie (Drummuir) has a recorded installed capacity of 48 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hill of Towie (Drummuir)?

REPD records the operator as Renewable Energy Systems (RES). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hill of Towie (Drummuir) approved and built?

The application was submitted on 15 November 2002. Permission was granted on 11 November 2003, 12 months later. The site became operational on 1 June 2012, 103 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4014.