Renewable sites › Hill of Towie (Drummuir)
Hill of Towie (Drummuir)
Hill of Towie (Drummuir) is operational in Moray with a recorded capacity of 48 MW, and has been generating since 2012-06-01.
Planning and build timeline
| Application submitted | 2002-11-15 |
| Permission granted | 2003-11-11 12 months after submission |
| Operational | 2012-06-01 103 months after consent |
Moray’s record on onshore wind
Moray has decided 13 onshore wind schemes and approved 77%, taking a median of 16.4 months. See every onshore wind scheme decision in Moray →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Rothes Wind (Cairn Uish) Wind Onshore · Operational | 50.6 | 9.6 km |
Rothes Wind Farm (Extension) (II) Wind Onshore · Operational | 41.4 | 9.6 km |
Rothes Bio-Plant Biomass (dedicated) · Operational | 8.3 | 13.4 km |
How big is Hill of Towie (Drummuir)?
Hill of Towie (Drummuir) has a recorded installed capacity of 48 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Hill of Towie (Drummuir)?
REPD records the operator as Renewable Energy Systems (RES). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Hill of Towie (Drummuir) approved and built?
The application was submitted on 2002-11-15. Permission was granted on 2003-11-11, 12 months later. The site became operational on 2012-06-01, 103 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4014.