Novarly ParcelRenewable sites

Renewable sitesRobin Rigg West

Robin Rigg West

Robin Rigg West is an operational 90 MW offshore wind farm in Scotland, generating since 18 July 2009. Planning permission was granted on 16 June 2003, 12 months after submission. Operator of record: E.ON UK.

90 MW
Capacity
as recorded in REPD
Operational
Status
since 18 July 2009
Wind Offshore
Technology
E.ON UK
National
Authority
Scotland

Planning and build timeline

Application submitted14 June 2002
Permission granted16 June 2003
12 months after submission
Operational18 July 2009
73 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the same record on your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Robin Rigg West’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wind Offshore · Operational
842.9 km
Wind Onshore · Operational
4.214.5 km
Wind Onshore · Operational
5.414.8 km
Wind Onshore · Operational
414.9 km
Biomass (dedicated) · Operational
4915 km

How big is Robin Rigg West?

Robin Rigg West has a recorded installed capacity of 90 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Robin Rigg West?

REPD records the operator as E.ON UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Robin Rigg West approved and built?

The application was submitted on 14 June 2002. Permission was granted on 16 June 2003, 12 months later. The site became operational on 18 July 2009, 73 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2497.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode