Renewable sitesMajors Hill/Turners Hill Solar Farm

Majors Hill/Turners Hill Solar Farm

Majors Hill/Turners Hill Solar Farm is operational in Mid Sussex with a recorded capacity of 1.1 MW, and has been generating since 2016-03-15.

1.1 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-03-15
Solar Photovoltaics
Technology
Haymaker Energy
Mid Sussex
Authority
England

Planning and build timeline

Application submitted2015-06-15
Permission granted2015-10-02
4 months after submission
Operational2016-03-15
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Mid Sussex’s record on solar

Mid Sussex has decided 11 solar farms and approved 91%, taking a median of 3.6 months. See every solar farm decision in Mid Sussex

Other built sites within 15 km

SiteMWDistance
Oriel High School
Solar Photovoltaics · Operational
0.193.5 km
South Terminal Car Park Forecourt - Electric Vehicle Charging Forecourt
Battery · Under Construction
7.7 km
Worsted Farm
Solar Photovoltaics · Operational
58.8 km
Land At Chiddinglye Farm
Solar Photovoltaics · Operational
512.8 km
Redhill 2
Landfill Gas · Operational
314.2 km

How big is Majors Hill/Turners Hill Solar Farm?

Majors Hill/Turners Hill Solar Farm has a recorded installed capacity of 1.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Majors Hill/Turners Hill Solar Farm?

REPD records the operator as Haymaker Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Majors Hill/Turners Hill Solar Farm approved and built?

The application was submitted on 2015-06-15. Permission was granted on 2015-10-02, 4 months later. The site became operational on 2016-03-15, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5267.