Ray Battery Storage Facility

Ray Battery Storage Facility is operational in Northumberland with a recorded capacity of 20 MW, and has been generating since 2022-10-01.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 2022-10-01
Battery
Technology
Vattenfall Wind Power
Northumberland
Authority
England

Planning and build timeline

Application submitted2017-05-30
Permission granted2021-10-21
53 months after submission
Operational2022-10-01
11 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Northumberland’s record on battery storage

Northumberland has decided 12 battery storage schemes and approved 100%, taking a median of 7.3 months. See every battery storage scheme decision in Northumberland

Other built sites within 15 km

SiteMWDistance
Ray Wind Farm
Wind Onshore · Operational
54.41.9 km
Green Rigg
Wind Onshore · Operational
364.8 km
Kirkheaton Wind Farm
Wind Onshore · Operational
1.810.5 km
Kielder
Large Hydro · Operational
6.115 km

How big is Ray Battery Storage Facility?

Ray Battery Storage Facility has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ray Battery Storage Facility?

REPD records the operator as Vattenfall Wind Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ray Battery Storage Facility approved and built?

The application was submitted on 2017-05-30. Permission was granted on 2021-10-21, 53 months later. The site became operational on 2022-10-01, 11 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6943.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council