Kielder is an operational 6.1 MW hydro scheme in Northumberland, generating since 1 June 1982. REPD does not record the planning grant date. Operator of record: RWE.

6.1 MW
Capacity
as recorded in REPD
Operational
Status
since 1 June 1982
Large Hydro
Technology
RWE
Northumberland
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1 June 1982

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Northumberland: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Kielder’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
3613.6 km
Battery · Operational
2015 km

How big is Kielder?

Kielder has a recorded installed capacity of 6.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kielder?

REPD records the operator as RWE. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kielder approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 June 1982.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4883.