Novarly ParcelRenewable sites

Renewable sitesKirkheaton Wind Farm

Kirkheaton Wind Farm

Kirkheaton Wind Farm is operational in Northumberland with a recorded capacity of 1.8 MW, and has been generating since 2000-05-22.

1.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2000-05-22
Wind Onshore
Technology
Border Wind Farms Ltd /AMEC
Northumberland
Authority
England

Planning and build timeline

Application submitted1997-11-04
Permission granted1999-01-21
15 months after submission
Operational2000-05-22
16 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Northumberland’s record on onshore wind

Northumberland has decided 31 onshore wind schemes and approved 52%, taking a median of 16.3 months. See every onshore wind scheme decision in Northumberland

Other built sites within 15 km

SiteMWDistance
Green Rigg
Wind Onshore · Operational
3610.2 km
Ray Battery Storage Facility
Battery · Operational
2010.5 km
Ray Wind Farm
Wind Onshore · Operational
54.411.9 km
Land South East Of Water Treatment Works Bridge End
Anaerobic Digestion · Operational
1.513.9 km

How big is Kirkheaton Wind Farm?

Kirkheaton Wind Farm has a recorded installed capacity of 1.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Kirkheaton Wind Farm?

REPD records the operator as Border Wind Farms Ltd /AMEC. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Kirkheaton Wind Farm approved and built?

The application was submitted on 1997-11-04. Permission was granted on 1999-01-21, 15 months later. The site became operational on 2000-05-22, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2587.