Point Wind / Beinn Ghrideag Farm

Point Wind / Beinn Ghrideag Farm is operational in Na h-Eileanan Siar with a recorded capacity of 9 MW, and has been generating since 2015-07-17.

9 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-07-17
Wind Onshore
Technology
Point Power & Energy Ltd / SgurrEnergy
Na h-Eileanan Siar
Authority
Scotland

Planning and build timeline

Application submitted2008-08-13
Permission granted2012-04-26
44 months after submission
Operational2015-07-17
39 months after consent

Na h-Eileanan Siar’s record on onshore wind

Na h-Eileanan Siar has decided 12 onshore wind schemes and approved 83%, taking a median of 18.9 months. See every onshore wind scheme decision in Na h-Eileanan Siar

Other built sites within 15 km

SiteMWDistance
Arnish Moor
Wind Onshore · Operational
3.94.3 km
Pentland Road Wind Farm
Wind Onshore · Operational
13.85.8 km

How big is Point Wind / Beinn Ghrideag Farm?

Point Wind / Beinn Ghrideag Farm has a recorded installed capacity of 9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Point Wind / Beinn Ghrideag Farm?

REPD records the operator as Point Power & Energy Ltd / SgurrEnergy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Point Wind / Beinn Ghrideag Farm approved and built?

The application was submitted on 2008-08-13. Permission was granted on 2012-04-26, 44 months later. The site became operational on 2015-07-17, 39 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4272.