Arnish Moor is an operational 3.9 MW onshore wind farm in Na h-Eileanan Siar, generating since 1 December 2006. Planning permission was granted on 1 September 2001, 3 months after submission. Operator of record: Arnish Electric Ltd / Farm Energy.

3.9 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2006
Wind Onshore
Technology
Arnish Electric Ltd / Farm Energy
Na h-Eileanan Siar
Authority
Scotland

Planning and build timeline

Application submitted1 June 2001
Permission granted1 September 2001
3 months after submission
Operational1 December 2006
63 months after consent

Screening a site of your own?

RedlineUK · £39

Na h-Eileanan Siar approves 83% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Arnish Moor’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Na h-Eileanan Siar’s record on onshore wind

Na h-Eileanan Siar has decided 12 onshore wind schemes and approved 83%, taking a median of 18.9 months. See every onshore wind scheme decision in Na h-Eileanan Siar

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
94.3 km
Wind Onshore · Operational
13.89.9 km

How big is Arnish Moor?

Arnish Moor has a recorded installed capacity of 3.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Arnish Moor?

REPD records the operator as Arnish Electric Ltd / Farm Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Arnish Moor approved and built?

The application was submitted on 1 June 2001. Permission was granted on 1 September 2001, 3 months later. The site became operational on 1 December 2006, 63 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3306.

Novarly Parcel · official public data, read properly · parcel.novarly.com