Langford Solar Farm is an operational 35 MW battery storage site in Mid Devon, generating since 2 August 2025. Planning permission was granted on 5 December 2022, 48 months after submission. Operator of record: JBM Solar Projects.

35 MW
Capacity
as recorded in REPD
Operational
Status
since 2 August 2025
Battery
Technology
JBM Solar Projects
Mid Devon
Authority
England

Planning and build timeline

Application submitted28 November 2018
Permission granted5 December 2022
48 months after submission
Operational2 August 2025
32 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Mid Devon: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Langford Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
350 km
Solar Photovoltaics · Operational
51.8 km
Solar Photovoltaics · Under Construction
492.9 km
Solar Photovoltaics · Operational
1.84.3 km
Solar Photovoltaics · Under Construction
55.5 km
Solar Photovoltaics · Operational
56.2 km
Solar Photovoltaics · Operational
76.8 km
Solar Photovoltaics · Operational
1.26.9 km

How big is Langford Solar Farm?

Langford Solar Farm has a recorded installed capacity of 35 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Langford Solar Farm?

REPD records the operator as JBM Solar Projects. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Langford Solar Farm approved and built?

The application was submitted on 28 November 2018. Permission was granted on 5 December 2022, 48 months later. The site became operational on 2 August 2025, 32 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 19164.

Novarly Parcel · official public data, read properly · parcel.novarly.com