Renewable sites › Walpole Landfill
Walpole Landfill
Walpole Landfill is an operational 1.6 MW landfill gas site in Somerset, generating since 3 March 1999. Planning permission was granted on 15 November 1996, 2 months after submission. Operator of record: Thomas Graveson Ltd.
Planning and build timeline
| Application submitted | 2 September 1996 |
| Permission granted | 15 November 1996 2 months after submission |
| Operational | 3 March 1999 28 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Somerset: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Walpole Landfill’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 1.6 | 0 km |
Solar Photovoltaics · Operational | 11.4 | 0.6 km |
Solar Photovoltaics · Operational | 4.6 | 1.4 km |
Solar Photovoltaics · Operational | 5.5 | 1.9 km |
Solar Photovoltaics · Operational | 24 | 2.5 km |
Solar Photovoltaics · Operational | 7 | 4.2 km |
Solar Photovoltaics · Operational | 10.2 | 5.3 km |
Solar Photovoltaics · Operational | 3 | 6.5 km |
How big is Walpole Landfill?
Walpole Landfill has a recorded installed capacity of 1.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Walpole Landfill?
REPD records the operator as Thomas Graveson Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Walpole Landfill approved and built?
The application was submitted on 2 September 1996. Permission was granted on 15 November 1996, 2 months later. The site became operational on 3 March 1999, 28 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 613.
Novarly Parcel · official public data, read properly · parcel.novarly.com