Orton Park Farm is an operational 1.6 MW onshore wind farm in Cumberland, generating since 15 June 2017. Planning permission was granted on 19 July 2013, 3 months after submission. Operator of record: Orton Park Wind Energy.

1.6 MW
Capacity
as recorded in REPD
Operational
Status
since 15 June 2017
Wind Onshore
Technology
Orton Park Wind Energy
Cumberland
Authority
England

Planning and build timeline

Application submitted25 April 2013
Permission granted19 July 2013
3 months after submission
Operational15 June 2017
47 months after consent

Screening a site of your own?

RedlineUK · £39

Cumberland approves 66% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Orton Park Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cumberland’s record on onshore wind

Cumberland has decided 38 onshore wind schemes and approved 66%, taking a median of 10.3 months. See every onshore wind scheme decision in Cumberland

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
6.41.4 km
Wind Onshore · Operational
2.34.2 km
Wind Onshore · Operational
44.5 km
Solar Photovoltaics · Operational
4.46.7 km
Solar Photovoltaics · Operational
57.2 km
Solar Photovoltaics · Operational
58.9 km
Wind Onshore · Operational
3.914.8 km

How big is Orton Park Farm?

Orton Park Farm has a recorded installed capacity of 1.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Orton Park Farm?

REPD records the operator as Orton Park Wind Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Orton Park Farm approved and built?

The application was submitted on 25 April 2013. Permission was granted on 19 July 2013, 3 months later. The site became operational on 15 June 2017, 47 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3359.