Novarly ParcelRenewable sites

Renewable sitesNorthern Isles New Energy Solution (NINES) 1

Northern Isles New Energy Solution (NINES) 1

Northern Isles New Energy Solution (NINES) 1 is an operational 1 MW battery storage site in Shetland Islands, generating since 15 February 2014. REPD does not record the planning grant date. Operator of record: Scottish Hydroelectric Power Distribution (SHEPD).

1 MW
Capacity
as recorded in REPD
Operational
Status
since 15 February 2014
Battery
Technology
Scottish Hydroelectric Power Distribution (SHEPD)
Shetland Islands
Authority
Scotland

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational15 February 2014

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Shetland Islands: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Northern Isles New Energy Solution (NINES) 1’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
32.8 km
Solar Photovoltaics · Operational
3.4 km
Wind Onshore · Operational
3.74 km

How big is Northern Isles New Energy Solution (NINES) 1?

Northern Isles New Energy Solution (NINES) 1 has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Northern Isles New Energy Solution (NINES) 1?

REPD records the operator as Scottish Hydroelectric Power Distribution (SHEPD). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Northern Isles New Energy Solution (NINES) 1 approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 15 February 2014.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6855.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode