Renewable sites › Northern Isles New Energy Solution (NINES) 1
Northern Isles New Energy Solution (NINES) 1
Northern Isles New Energy Solution (NINES) 1 is operational in Shetland Islands with a recorded capacity of 1 MW, and has been generating since 2014-02-15.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2014-02-15 |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Gremista Wind Farm Wind Onshore · Operational | 3 | 2.8 km |
Gunnista, Bressay Solar panels Solar Photovoltaics · Operational | — | 3.4 km |
Burradale Hill Wind Onshore · Operational | 3.7 | 4 km |
How big is Northern Isles New Energy Solution (NINES) 1?
Northern Isles New Energy Solution (NINES) 1 has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Northern Isles New Energy Solution (NINES) 1?
REPD records the operator as Scottish Hydroelectric Power Distribution (SHEPD). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Northern Isles New Energy Solution (NINES) 1 approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2014-02-15.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6855.