Renewable sites › Northern Isles New Energy Solution (NINES) 1
Northern Isles New Energy Solution (NINES) 1
Northern Isles New Energy Solution (NINES) 1 is an operational 1 MW battery storage site in Shetland Islands, generating since 15 February 2014. REPD does not record the planning grant date. Operator of record: Scottish Hydroelectric Power Distribution (SHEPD).
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 15 February 2014 |
Screening a site of your own?
Redline runs the record on your own boundary in Shetland Islands: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Northern Isles New Energy Solution (NINES) 1’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 3 | 2.8 km |
Solar Photovoltaics · Operational | — | 3.4 km |
Wind Onshore · Operational | 3.7 | 4 km |
How big is Northern Isles New Energy Solution (NINES) 1?
Northern Isles New Energy Solution (NINES) 1 has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Northern Isles New Energy Solution (NINES) 1?
REPD records the operator as Scottish Hydroelectric Power Distribution (SHEPD). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Northern Isles New Energy Solution (NINES) 1 approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 15 February 2014.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6855.
Novarly Parcel · official public data, read properly · parcel.novarly.com