Renewable sitesGunnista, Bressay Solar panels

Gunnista, Bressay Solar panels

Gunnista, Bressay Solar panels is an operational solar farm in Shetland Islands, generating since 11 September 2021. Planning permission was granted on 9 July 2021, 5 months after submission. Operator of record: Bressay Development Limited.

Capacity
as recorded in REPD
Operational
Status
since 11 September 2021
Solar Photovoltaics
Technology
Bressay Development Limited
Shetland Islands
Authority
Scotland

Planning and build timeline

Application submitted11 February 2021
Permission granted9 July 2021
5 months after submission
Operational11 September 2021
2 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Shetland Islands: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Gunnista, Bressay Solar panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Battery · Operational
13.4 km
Wind Onshore · Operational
35.5 km
Wind Onshore · Operational
3.77 km

How big is Gunnista, Bressay Solar panels?

REPD does not record an installed capacity for Gunnista, Bressay Solar panels.

Who operates Gunnista, Bressay Solar panels?

REPD records the operator as Bressay Development Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Gunnista, Bressay Solar panels approved and built?

The application was submitted on 11 February 2021. Permission was granted on 9 July 2021, 5 months later. The site became operational on 11 September 2021, 2 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8451.