Burradale Hill

Burradale Hill is an operational 3.7 MW onshore wind farm in Shetland Islands, generating since 16 December 2000. Planning permission was granted on 3 February 1994, 4 months after submission. Operator of record: Shetland Aerogenerators.

3.7 MW
Capacity
as recorded in REPD
Operational
Status
since 16 December 2000
Wind Onshore
Technology
Shetland Aerogenerators
Shetland Islands
Authority
Scotland

Planning and build timeline

Application submitted8 October 1993
Permission granted3 February 1994
4 months after submission
Operational16 December 2000
82 months after consent

Screening a site of your own?

RedlineUK · £39

Shetland Islands approves 100% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Burradale Hill’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Shetland Islands’s record on onshore wind

Shetland Islands has decided 6 onshore wind schemes and approved 100%, taking a median of 5.8 months. See every onshore wind scheme decision in Shetland Islands

Other built sites within 15 km

SiteMWDistance
Battery · Operational
14 km
Wind Onshore · Operational
34.9 km
Solar Photovoltaics · Operational
7 km

How big is Burradale Hill?

Burradale Hill has a recorded installed capacity of 3.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Burradale Hill?

REPD records the operator as Shetland Aerogenerators. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Burradale Hill approved and built?

The application was submitted on 8 October 1993. Permission was granted on 3 February 1994, 4 months later. The site became operational on 16 December 2000, 82 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3310.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode