Renewable sites › Gremista Wind Farm
Gremista Wind Farm
Gremista Wind Farm is an operational 3 MW onshore wind farm in Shetland Islands, generating since 15 November 2015. Planning permission was granted on 24 February 2012, 6 months after submission. Operator of record: Shetland Aerogenerators.
Planning and build timeline
| Application submitted | 31 August 2011 |
| Permission granted | 24 February 2012 6 months after submission |
| Operational | 15 November 2015 45 months after consent |
Screening a site of your own?
Shetland Islands approves 100% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Gremista Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
Shetland Islands’s record on onshore wind
Shetland Islands has decided 6 onshore wind schemes and approved 100%, taking a median of 5.8 months. See every onshore wind scheme decision in Shetland Islands →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Battery · Operational | 1 | 2.8 km |
Wind Onshore · Operational | 3.7 | 4.9 km |
Solar Photovoltaics · Operational | — | 5.5 km |
How big is Gremista Wind Farm?
Gremista Wind Farm has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Gremista Wind Farm?
REPD records the operator as Shetland Aerogenerators. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Gremista Wind Farm approved and built?
The application was submitted on 31 August 2011. Permission was granted on 24 February 2012, 6 months later. The site became operational on 15 November 2015, 45 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4075.
Novarly Parcel · official public data, read properly · parcel.novarly.com