Novarly ParcelRenewable sites

Renewable sitesNorth Norfolk Business Centre Solar Park

North Norfolk Business Centre Solar Park

North Norfolk Business Centre Solar Park is operational in North Norfolk with a recorded capacity of 11 MW, and has been generating since 2014-02-28.

11 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-02-28
Solar Photovoltaics
Technology
NESF (formerly Lumicity) / Next Energy
North Norfolk
Authority
England

Planning and build timeline

Application submitted2012-07-30
Permission granted2012-11-16
4 months after submission
Operational2014-02-28
15 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North Norfolk’s record on solar

North Norfolk has decided 26 solar farms and approved 100%, taking a median of 2.7 months. See every solar farm decision in North Norfolk

Other built sites within 15 km

SiteMWDistance
North Norfolk Business Centre Solar Park - Battery Energy Storage Scheme
Battery · Operational
60.1 km
Hall Farm, East Beckham
Solar Photovoltaics · Operational
10.28.2 km
Pond Farm
Solar Photovoltaics · Operational
3.69.3 km
Carlton Farm Solar farm
Solar Photovoltaics · Operational
512.4 km
Frog's Loke Solar Farm
Solar Photovoltaics · Operational
513 km
Bunn's Hill Solar Park
Solar Photovoltaics · Operational
513 km
Oulton Airfield Solar Farm (Phase 1)
Solar Photovoltaics · Operational
514.2 km

How big is North Norfolk Business Centre Solar Park?

North Norfolk Business Centre Solar Park has a recorded installed capacity of 11 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates North Norfolk Business Centre Solar Park?

REPD records the operator as NESF (formerly Lumicity) / Next Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was North Norfolk Business Centre Solar Park approved and built?

The application was submitted on 2012-07-30. Permission was granted on 2012-11-16, 4 months later. The site became operational on 2014-02-28, 15 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1590.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council