Newton Ferrers solar park is an operational 19.5 MW solar farm in Cornwall, generating since 29 March 2016. Planning permission was granted on 1 August 2014, 3 months after submission. Operator of record: Gruene Energien.

19.5 MW
Capacity
as recorded in REPD
Operational
Status
since 29 March 2016
Solar Photovoltaics
Technology
Gruene Energien
Cornwall
Authority
England

Planning and build timeline

Application submitted7 May 2014
Permission granted1 August 2014
3 months after submission
Operational29 March 2016
20 months after consent

Screening a site of your own?

RedlineUK · £39

Cornwall approves 92% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Newton Ferrers solar park’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cornwall’s record on solar

Cornwall has decided 146 solar farms and approved 92%, taking a median of 3.3 months. See every solar farm decision in Cornwall

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
6.43.7 km
Solar Photovoltaics · Operational
4.44.3 km
Solar Photovoltaics · Operational
54.4 km
Solar Photovoltaics · Operational
10.66.1 km
Solar Photovoltaics · Operational
1.66.4 km
Solar Photovoltaics · Operational
9.96.4 km
Solar Photovoltaics · Operational
57.9 km
Solar Photovoltaics · Operational
57.9 km

How big is Newton Ferrers solar park?

Newton Ferrers solar park has a recorded installed capacity of 19.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Newton Ferrers solar park?

REPD records the operator as Gruene Energien. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Newton Ferrers solar park approved and built?

The application was submitted on 7 May 2014. Permission was granted on 1 August 2014, 3 months later. The site became operational on 29 March 2016, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2125.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode