Averhill Farm

Averhill Farm is an operational 5 MW solar farm in North East Derbyshire, generating since 16 December 2015. Planning permission was granted on 29 September 2015, 5 months after submission. Operator of record: Lightsource Renewable Energy.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 16 December 2015
Solar Photovoltaics
Technology
Lightsource Renewable Energy
North East Derbyshire
Authority
England

Planning and build timeline

Application submitted28 April 2015
Permission granted29 September 2015
5 months after submission
Operational16 December 2015
3 months after consent

Screening a site of your own?

RedlineUK · £39

North East Derbyshire approves 95% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Averhill Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

North East Derbyshire’s record on solar

North East Derbyshire has decided 19 solar farms and approved 95%, taking a median of 3.5 months. See every solar farm decision in North East Derbyshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
50 km
Solar Photovoltaics · Operational
50.6 km
Solar Photovoltaics · Under Construction
19.64.6 km
Solar Photovoltaics · Operational
55.5 km
Solar Photovoltaics · Operational
4.96.6 km
Solar Photovoltaics · Operational
4.77.4 km
Landfill Gas · Operational
27.4 km
Landfill Gas · Operational
37.5 km

How big is Averhill Farm?

Averhill Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Averhill Farm?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Averhill Farm approved and built?

The application was submitted on 28 April 2015. Permission was granted on 29 September 2015, 5 months later. The site became operational on 16 December 2015, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5287.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode