Lords Meadow Industrial Estate - Anaerobic Digestion Plant is under construction in Mid Devon.
Planning and build timeline
| Application submitted | 2018-11-16 |
| Permission granted | 2019-06-06 7 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Broadgate Solar Farm Solar Photovoltaics · Operational | 1.1 | 9.8 km |
Sharland Solar Farm Solar Photovoltaics · Operational | 2.8 | 10.1 km |
Ellicombe Farm Solar Photovoltaics · Operational | 1.4 | 11 km |
Heathfield 'A' Landfill Landfill Gas · Operational | 2 | 11.6 km |
St Francis Court Farm Solar Photovoltaics · Operational | 4 | 12.8 km |
Exeter EfW EfW Incineration · Operational | 13 | 12.8 km |
How big is Lords Meadow Industrial Estate - Anaerobic Digestion Plant?
REPD does not record an installed capacity for Lords Meadow Industrial Estate - Anaerobic Digestion Plant.
Who operates Lords Meadow Industrial Estate - Anaerobic Digestion Plant?
REPD records the operator as Lords Meadow Biogas Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Lords Meadow Industrial Estate - Anaerobic Digestion Plant approved and built?
The application was submitted on 2018-11-16. Permission was granted on 2019-06-06, 7 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11245.