Lords Meadow Industrial Estate - Anaerobic Digestion Plant is an anaerobic digestion plant under construction in Mid Devon. Planning permission was granted on 6 June 2019, 7 months after submission. Operator of record: Lords Meadow Biogas Limited.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Anaerobic Digestion
Technology
Lords Meadow Biogas Limited
Mid Devon
Authority
England

Planning and build timeline

Application submitted16 November 2018
Permission granted6 June 2019
7 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Mid Devon: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Lords Meadow Industrial Estate - Anaerobic Digestion Plant’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
1.19.8 km
Solar Photovoltaics · Operational
2.810.1 km
Solar Photovoltaics · Operational
1.411 km
Landfill Gas · Operational
211.6 km
Solar Photovoltaics · Operational
412.8 km
EfW Incineration · Operational
1312.8 km

How big is Lords Meadow Industrial Estate - Anaerobic Digestion Plant?

REPD does not record an installed capacity for Lords Meadow Industrial Estate - Anaerobic Digestion Plant.

Who operates Lords Meadow Industrial Estate - Anaerobic Digestion Plant?

REPD records the operator as Lords Meadow Biogas Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lords Meadow Industrial Estate - Anaerobic Digestion Plant approved and built?

The application was submitted on 16 November 2018. Permission was granted on 6 June 2019, 7 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11245.