Lords Meadow Industrial Estate - Anaerobic Digestion Plant

Lords Meadow Industrial Estate - Anaerobic Digestion Plant is under construction in Mid Devon.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Anaerobic Digestion
Technology
Lords Meadow Biogas Limited
Mid Devon
Authority
England

Planning and build timeline

Application submitted2018-11-16
Permission granted2019-06-06
7 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Broadgate Solar Farm
Solar Photovoltaics · Operational
1.19.8 km
Sharland Solar Farm
Solar Photovoltaics · Operational
2.810.1 km
Ellicombe Farm
Solar Photovoltaics · Operational
1.411 km
Heathfield 'A' Landfill
Landfill Gas · Operational
211.6 km
St Francis Court Farm
Solar Photovoltaics · Operational
412.8 km
Exeter EfW
EfW Incineration · Operational
1312.8 km

How big is Lords Meadow Industrial Estate - Anaerobic Digestion Plant?

REPD does not record an installed capacity for Lords Meadow Industrial Estate - Anaerobic Digestion Plant.

Who operates Lords Meadow Industrial Estate - Anaerobic Digestion Plant?

REPD records the operator as Lords Meadow Biogas Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lords Meadow Industrial Estate - Anaerobic Digestion Plant approved and built?

The application was submitted on 2018-11-16. Permission was granted on 2019-06-06, 7 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11245.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council