Lochluichart (Extension) is operational in Scottish Government (S36) with a recorded capacity of 18 MW, and has been generating since 2014-05-14.

18 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-05-14
Wind Onshore
Technology
Infinergy
Scottish Government (S36)
Authority
Scotland

Planning and build timeline

Application submitted2011-08-31
Permission granted2012-10-02
13 months after submission
Operational2014-05-14
19 months after consent

Scottish Government (S36)’s record on onshore wind

Scottish Government (S36) has decided 173 onshore wind schemes and approved 80%, taking a median of 33.7 months. See every onshore wind scheme decision in Scottish Government (S36)

Other built sites within 15 km

SiteMWDistance
Lochluichart
Wind Onshore · Operational
513.2 km
Corriemoillie
Wind Onshore · Operational
54.44.3 km
Achanalt
Small Hydro · Operational
38.9 km
Cuileig Hydro Scheme
Small Hydro · Operational
3.315 km

How big is Lochluichart (Extension)?

Lochluichart (Extension) has a recorded installed capacity of 18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lochluichart (Extension)?

REPD records the operator as Infinergy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lochluichart (Extension) approved and built?

The application was submitted on 2011-08-31. Permission was granted on 2012-10-02, 13 months later. The site became operational on 2014-05-14, 19 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4395.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council