Novarly ParcelRenewable sites

Renewable sitesCorriemoillie

Corriemoillie

Corriemoillie is an operational 54.4 MW onshore wind farm in Highland, generating since 26 April 2017. Planning permission was granted on 23 March 2011, 6 months after submission. Operator of record: EDF Energy Renewables.

54.4 MW
Capacity
as recorded in REPD
Operational
Status
since 26 April 2017
Wind Onshore
Technology
EDF Energy Renewables
Highland
Authority
Scotland

Planning and build timeline

Application submitted5 October 2010
Permission granted23 March 2011
6 months after submission
Operational26 April 2017
73 months after consent

Screening a site of your own?

RedlineUK · £39

Highland approves 63% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Corriemoillie’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Highland’s record on onshore wind

Highland has decided 99 onshore wind schemes and approved 63%, taking a median of 13.9 months. See every onshore wind scheme decision in Highland

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
513 km
Wind Onshore · Operational
184.3 km
Small Hydro · Operational
310.7 km

How big is Corriemoillie?

Corriemoillie has a recorded installed capacity of 54.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Corriemoillie?

REPD records the operator as EDF Energy Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Corriemoillie approved and built?

The application was submitted on 5 October 2010. Permission was granted on 23 March 2011, 6 months later. The site became operational on 26 April 2017, 73 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4120.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode