Llanbabo Wind Farm

Llanbabo Wind Farm is operational in Isle of Anglesey with a recorded capacity of 20.4 MW, and has been generating since 1997-10-01.

20.4 MW
Capacity
as recorded in REPD
Operational
Status
since 1997-10-01
Wind Onshore
Technology
MANWEB Generation Holdings
Isle of Anglesey
Authority
Wales

Planning and build timeline

Application submitted1994-08-05
Permission granted1996-12-19
28 months after submission
Operational1997-10-01
9 months after consent

Isle of Anglesey’s record on onshore wind

Isle of Anglesey has decided 7 onshore wind schemes and approved 57%, taking a median of 16.1 months. See every onshore wind scheme decision in Isle of Anglesey

Other built sites within 15 km

SiteMWDistance
Ystgellog Farm Wind Farm
Wind Onshore · Operational
4.66.2 km
Porth Wen
Solar Photovoltaics · Under Construction
49.96.5 km
Trysglwyn Wind Farm
Wind Onshore · Operational
5.68.2 km
Bryn yr Odyn Solar Farm
Solar Photovoltaics · Operational
1514.1 km

How big is Llanbabo Wind Farm?

Llanbabo Wind Farm has a recorded installed capacity of 20.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Llanbabo Wind Farm?

REPD records the operator as MANWEB Generation Holdings. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Llanbabo Wind Farm approved and built?

The application was submitted on 1994-08-05. Permission was granted on 1996-12-19, 28 months later. The site became operational on 1997-10-01, 9 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2582.