Bryn yr Odyn Solar Farm
Bryn yr Odyn Solar Farm is an operational 15 MW solar farm in Isle of Anglesey, generating since 28 February 2015. Planning permission was granted on 6 November 2013, 2 months after submission. Operator of record: New Forest Energy Ltd.
Planning and build timeline
| Application submitted | 8 September 2013 |
| Permission granted | 6 November 2013 2 months after submission |
| Operational | 28 February 2015 16 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Isle of Anglesey: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Bryn yr Odyn Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 12.6 | 6.1 km |
Solar Photovoltaics · Operational | 13.9 | 13.3 km |
Wind Onshore · Operational | 20.4 | 14.1 km |
How big is Bryn yr Odyn Solar Farm?
Bryn yr Odyn Solar Farm has a recorded installed capacity of 15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Bryn yr Odyn Solar Farm?
REPD records the operator as New Forest Energy Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Bryn yr Odyn Solar Farm approved and built?
The application was submitted on 8 September 2013. Permission was granted on 6 November 2013, 2 months later. The site became operational on 28 February 2015, 16 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2353.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode