Novarly ParcelRenewable sites

Renewable sitesBryn yr Odyn Solar Farm

Bryn yr Odyn Solar Farm

Bryn yr Odyn Solar Farm is an operational 15 MW solar farm in Isle of Anglesey, generating since 28 February 2015. Planning permission was granted on 6 November 2013, 2 months after submission. Operator of record: New Forest Energy Ltd.

15 MW
Capacity
as recorded in REPD
Operational
Status
since 28 February 2015
Solar Photovoltaics
Technology
New Forest Energy Ltd
Isle of Anglesey
Authority
Wales

Planning and build timeline

Application submitted8 September 2013
Permission granted6 November 2013
2 months after submission
Operational28 February 2015
16 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Isle of Anglesey: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bryn yr Odyn Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
12.66.1 km
Solar Photovoltaics · Operational
13.913.3 km
Wind Onshore · Operational
20.414.1 km

How big is Bryn yr Odyn Solar Farm?

Bryn yr Odyn Solar Farm has a recorded installed capacity of 15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bryn yr Odyn Solar Farm?

REPD records the operator as New Forest Energy Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bryn yr Odyn Solar Farm approved and built?

The application was submitted on 8 September 2013. Permission was granted on 6 November 2013, 2 months later. The site became operational on 28 February 2015, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2353.

Novarly Parcel · official public data, read properly · parcel.novarly.com