Renewable sites › Little Toms - Solar Farm
Little Toms - Solar Farm
Little Toms - Solar Farm is a 5 MW solar farm under construction in Mid Devon. Planning permission was granted on 20 June 2024, 7 months after submission. Operator of record: PS Renewables.
Planning and build timeline
| Application submitted | 28 November 2023 |
| Permission granted | 20 June 2024 7 months after submission |
| Operational | not recorded |
Screening a site of your own?
Mid Devon approves 80% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Little Toms - Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Mid Devon’s record on solar
Mid Devon has decided 30 solar farms and approved 80%, taking a median of 2.9 months. See every solar farm decision in Mid Devon →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 1.8 | 1.2 km |
Solar Photovoltaics · Operational | 5 | 2.8 km |
Anaerobic Digestion · Operational | 2 | 4.1 km |
Solar Photovoltaics · Operational | 3.1 | 4.3 km |
Solar Photovoltaics · Operational | 5 | 4.6 km |
Solar Photovoltaics · Operational | 2.1 | 5.5 km |
Solar Photovoltaics · Operational | 35 | 5.5 km |
Battery · Operational | 35 | 5.5 km |
How big is Little Toms - Solar Farm?
Little Toms - Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Little Toms - Solar Farm?
REPD records the operator as PS Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Little Toms - Solar Farm approved and built?
The application was submitted on 28 November 2023. Permission was granted on 20 June 2024, 7 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13014.
Novarly Parcel · official public data, read properly · parcel.novarly.com