Lidl Foodstore - Solar Panels

Lidl Foodstore - Solar Panels is operational in Cornwall with a recorded capacity of 0.18 MW, and has been generating since 2022-01-01.

0.18 MW
Capacity
as recorded in REPD
Operational
Status
since 2022-01-01
Solar Photovoltaics
Technology
Lidl Great Britain
Cornwall
Authority
England

Planning and build timeline

Application submitted2021-06-11
Permission granted2021-08-24
2 months after submission
Operational2022-01-01
4 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cornwall’s record on solar

Cornwall has decided 146 solar farms and approved 92%, taking a median of 3.3 months. See every solar farm decision in Cornwall

Other built sites within 15 km

SiteMWDistance
Hayle Wave Hub (Test Site)
Shoreline Wave · Operational
2312.6 km
Wheal Alfred Road Solar Farm
Solar Photovoltaics · Operational
3.513.2 km
Pengelly Barton Farm
Anaerobic Digestion · Operational
114.9 km

How big is Lidl Foodstore - Solar Panels?

Lidl Foodstore - Solar Panels has a recorded installed capacity of 0.18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lidl Foodstore - Solar Panels?

REPD records the operator as Lidl Great Britain. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lidl Foodstore - Solar Panels approved and built?

The application was submitted on 2021-06-11. Permission was granted on 2021-08-24, 2 months later. The site became operational on 2022-01-01, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9190.