Novarly ParcelRenewable sites

Renewable sitesLand South Of Bryn Cyrnau Isaf

Land South Of Bryn Cyrnau Isaf

Land South Of Bryn Cyrnau Isaf is an operational 5.9 MW solar farm in Carmarthenshire, generating since 31 March 2017. Planning permission was granted on 9 June 2015, 3 months after submission. Operator of record: Green Switch Solutions - Liquidated.

5.9 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2017
Solar Photovoltaics
Technology
Green Switch Solutions - Liquidated
Carmarthenshire
Authority
Wales

Planning and build timeline

Application submitted9 March 2015
Permission granted9 June 2015
3 months after submission
Operational31 March 2017
22 months after consent

Screening a site of your own?

RedlineUK · £39

Carmarthenshire approves 93% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Land South Of Bryn Cyrnau Isaf’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Carmarthenshire’s record on solar

Carmarthenshire has decided 28 solar farms and approved 93%, taking a median of 4.8 months. See every solar farm decision in Carmarthenshire

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
1.44.3 km
Solar Photovoltaics · Operational
3.35.4 km
Solar Photovoltaics · Operational
1.511.8 km
Solar Photovoltaics · Operational
5.512.4 km
Solar Photovoltaics · Operational
5.513.7 km

How big is Land South Of Bryn Cyrnau Isaf?

Land South Of Bryn Cyrnau Isaf has a recorded installed capacity of 5.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land South Of Bryn Cyrnau Isaf?

REPD records the operator as Green Switch Solutions - Liquidated. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land South Of Bryn Cyrnau Isaf approved and built?

The application was submitted on 9 March 2015. Permission was granted on 9 June 2015, 3 months later. The site became operational on 31 March 2017, 22 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5271.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode