Novarly ParcelRenewable sites

Renewable sitesLand South Of Bryn Cyrnau Isaf

Land South Of Bryn Cyrnau Isaf

Land South Of Bryn Cyrnau Isaf is operational in Carmarthenshire with a recorded capacity of 5.9 MW, and has been generating since 2017-03-31.

5.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-31
Solar Photovoltaics
Technology
Green Switch Solutions - Liquidated
Carmarthenshire
Authority
Wales

Planning and build timeline

Application submitted2015-03-09
Permission granted2015-06-09
3 months after submission
Operational2017-03-31
22 months after consent

Carmarthenshire’s record on solar

Carmarthenshire has decided 28 solar farms and approved 93%, taking a median of 4.8 months. See every solar farm decision in Carmarthenshire

Other built sites within 15 km

SiteMWDistance
Nant y Caws Landfill Site
Landfill Gas · Operational
1.44.3 km
Redcourt Farm
Solar Photovoltaics · Operational
3.35.4 km
Pont Andrew Solar Farm
Solar Photovoltaics · Operational
1.511.8 km
Ffos Las Racecourse
Solar Photovoltaics · Operational
5.512.4 km
Pentre farm
Solar Photovoltaics · Operational
5.513.7 km

How big is Land South Of Bryn Cyrnau Isaf?

Land South Of Bryn Cyrnau Isaf has a recorded installed capacity of 5.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land South Of Bryn Cyrnau Isaf?

REPD records the operator as Green Switch Solutions - Liquidated. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land South Of Bryn Cyrnau Isaf approved and built?

The application was submitted on 2015-03-09. Permission was granted on 2015-06-09, 3 months later. The site became operational on 2017-03-31, 22 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5271.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council