Novarly ParcelRenewable sites

Renewable sitesLand near Ventonteague

Land near Ventonteague

Land near Ventonteague is an operational 2.3 MW onshore wind farm in Cornwall, generating since 22 July 2020. Planning permission was granted on 1 December 2019, 14 months after submission. Operator of record: Cornwall Council.

2.3 MW
Capacity
as recorded in REPD
Operational
Status
since 22 July 2020
Wind Onshore
Technology
Cornwall Council
Cornwall
Authority
England

Planning and build timeline

Application submitted10 October 2018
Permission granted1 December 2019
14 months after submission
Operational22 July 2020
8 months after consent

Screening a site of your own?

RedlineUK · £39

Cornwall approves 74% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Land near Ventonteague’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cornwall’s record on onshore wind

Cornwall has decided 35 onshore wind schemes and approved 74%, taking a median of 7.5 months. See every onshore wind scheme decision in Cornwall

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
112.4 km
Solar Photovoltaics · Operational
2.92.6 km
Solar Photovoltaics · Operational
7.73.2 km
Solar Photovoltaics · Under Construction
103.3 km
Solar Photovoltaics · Operational
63.3 km
Battery · Under Construction
13.8 km
Wind Onshore · Operational
203.8 km
Solar Photovoltaics · Operational
75.8 km

How big is Land near Ventonteague?

Land near Ventonteague has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land near Ventonteague?

REPD records the operator as Cornwall Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land near Ventonteague approved and built?

The application was submitted on 10 October 2018. Permission was granted on 1 December 2019, 14 months later. The site became operational on 22 July 2020, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7588.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode