Carland Cross Wind Farm - Storage is under construction in Cornwall with a recorded capacity of 1 MW.
Planning and build timeline
| Application submitted | 2018-08-12 |
| Permission granted | not recorded |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Cornwall’s record on battery storage
Cornwall has decided 25 battery storage schemes and approved 96%, taking a median of 3.4 months. See every battery storage scheme decision in Cornwall →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Carland Cross Wind Farm Repowering Wind Onshore · Operational | 20 | 0.4 km |
Carland Cross - Solar Farm Solar Photovoltaics · Under Construction | 10 | 2.7 km |
Land near Ventonteague Wind Onshore · Operational | 2.3 | 3.8 km |
Tregassow Farm - Solar Modules Solar Photovoltaics · Operational | 6 | 5.3 km |
Trevemper solar farm Solar Photovoltaics · Operational | 1.7 | 5.3 km |
Goonabarn Farm Wind Turbines Wind Onshore · Operational | 1 | 5.4 km |
HENDRA HOLIDAY PARK SOLAR FARM Solar Photovoltaics · Operational | 1.2 | 5.4 km |
Trefullock Solar Farm Solar Photovoltaics · Operational | 5 | 5.9 km |
How big is Carland Cross Wind Farm - Storage?
Carland Cross Wind Farm - Storage has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Carland Cross Wind Farm - Storage?
REPD records the operator as Scottish Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Carland Cross Wind Farm - Storage approved and built?
The application was submitted on 2018-08-12. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7034.