Renewable sites › Carland Cross Wind Farm - Storage
Carland Cross Wind Farm - Storage
Carland Cross Wind Farm - Storage is a 1 MW battery storage site under construction in Cornwall. REPD does not record the planning grant date. Operator of record: Scottish Power.
Planning and build timeline
| Application submitted | 12 August 2018 |
| Permission granted | not recorded |
| Operational | not recorded |
Screening a site of your own?
Cornwall approves 96% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Carland Cross Wind Farm - Storage’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Cornwall’s record on battery storage
Cornwall has decided 25 battery storage schemes and approved 96%, taking a median of 3.4 months. See every battery storage scheme decision in Cornwall →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 20 | 0.4 km |
Solar Photovoltaics · Under Construction | 10 | 2.7 km |
Wind Onshore · Operational | 2.3 | 3.8 km |
Solar Photovoltaics · Operational | 6 | 5.3 km |
Solar Photovoltaics · Operational | 1.7 | 5.3 km |
Wind Onshore · Operational | 1 | 5.4 km |
Solar Photovoltaics · Operational | 1.2 | 5.4 km |
Solar Photovoltaics · Operational | 5 | 5.9 km |
How big is Carland Cross Wind Farm - Storage?
Carland Cross Wind Farm - Storage has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Carland Cross Wind Farm - Storage?
REPD records the operator as Scottish Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Carland Cross Wind Farm - Storage approved and built?
The application was submitted on 12 August 2018. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7034.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode