Renewable sitesCarland Cross Wind Farm - Storage

Carland Cross Wind Farm - Storage

Carland Cross Wind Farm - Storage is under construction in Cornwall with a recorded capacity of 1 MW.

1 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Scottish Power
Cornwall
Authority
England

Planning and build timeline

Application submitted2018-08-12
Permission grantednot recorded
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cornwall’s record on battery storage

Cornwall has decided 25 battery storage schemes and approved 96%, taking a median of 3.4 months. See every battery storage scheme decision in Cornwall

Other built sites within 15 km

SiteMWDistance
Carland Cross Wind Farm Repowering
Wind Onshore · Operational
200.4 km
Carland Cross - Solar Farm
Solar Photovoltaics · Under Construction
102.7 km
Land near Ventonteague
Wind Onshore · Operational
2.33.8 km
Tregassow Farm - Solar Modules
Solar Photovoltaics · Operational
65.3 km
Trevemper solar farm
Solar Photovoltaics · Operational
1.75.3 km
Goonabarn Farm Wind Turbines
Wind Onshore · Operational
15.4 km
HENDRA HOLIDAY PARK SOLAR FARM
Solar Photovoltaics · Operational
1.25.4 km
Trefullock Solar Farm
Solar Photovoltaics · Operational
55.9 km

How big is Carland Cross Wind Farm - Storage?

Carland Cross Wind Farm - Storage has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Carland Cross Wind Farm - Storage?

REPD records the operator as Scottish Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Carland Cross Wind Farm - Storage approved and built?

The application was submitted on 2018-08-12. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7034.