Renewable sitesLand at Lostock Works (Northwich Facility)

Land at Lostock Works (Northwich Facility)

Land at Lostock Works (Northwich Facility) is operational in Cheshire West and Chester with a recorded capacity of 5 MW, and has been generating since 2016-10-20.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-10-20
Anaerobic Digestion
Technology
Orsted (formerly Dong Energy)
Cheshire West and Chester
Authority
England

Planning and build timeline

Application submitted2015-10-08
Permission granted2016-02-11
4 months after submission
Operational2016-10-20
8 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Lostock
EfW Incineration · Under Construction
601.8 km
Barclays Bank Plc, Radbroke Solar Carport - Solar Panels
Solar Photovoltaics · Under Construction
2.59 km
London Road, Holmes Chapel Photovoltaic Panels
Solar Photovoltaics · Under Construction
0.9611.5 km
Land south of Wood Lane (Safeguard Bradwell)
Solar Photovoltaics · Operational
513.5 km
Former St Michaels Golf Course
Solar Photovoltaics · Under Construction
113.5 km
Daresbury Science Park - Solar Array
Solar Photovoltaics · Operational
0.5613.8 km
Butchersfield Landfill Site
Landfill Gas · Operational
314.9 km

How big is Land at Lostock Works (Northwich Facility)?

Land at Lostock Works (Northwich Facility) has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land at Lostock Works (Northwich Facility)?

REPD records the operator as Orsted (formerly Dong Energy). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land at Lostock Works (Northwich Facility) approved and built?

The application was submitted on 2015-10-08. Permission was granted on 2016-02-11, 4 months later. The site became operational on 2016-10-20, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5816.