Novarly ParcelRenewable sites

Renewable sitesLady Hole Farm

Lady Hole Farm

Lady Hole Farm is operational in Derbyshire Dales with a recorded capacity of 3 MW, and has been generating since 2016-03-30.

3 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-03-30
Solar Photovoltaics
Technology
Solarig
Derbyshire Dales
Authority
England

Planning and build timeline

Application submitted2015-04-22
Permission granted2015-07-23
3 months after submission
Operational2016-03-30
8 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Derbyshire Dales’s record on solar

Derbyshire Dales has decided 13 solar farms and approved 92%, taking a median of 2.9 months. See every solar farm decision in Derbyshire Dales

Other built sites within 15 km

SiteMWDistance
Land at Dayfields Farm
Solar Photovoltaics · Operational
4.73 km
Smith Hall Farm Solar Park
Solar Photovoltaics · Operational
55.9 km
Carsington Pasture
Wind Onshore · Operational
89.2 km
Sibelco Brassington
Wind Onshore · Operational
2.310 km
Ryder Point Quarry Wind Turbines
Wind Onshore · Operational
510.3 km
Somersal Mill Farm
Solar Photovoltaics · Operational
2.612.5 km
Woodhouse Fields Farm
Solar Photovoltaics · Operational
513.7 km
Aston House Solar Farm
Solar Photovoltaics · Operational
2014.6 km

How big is Lady Hole Farm?

Lady Hole Farm has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lady Hole Farm?

REPD records the operator as Solarig. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lady Hole Farm approved and built?

The application was submitted on 2015-04-22. Permission was granted on 2015-07-23, 3 months later. The site became operational on 2016-03-30, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5212.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council