Sibelco Brassington

Sibelco Brassington is operational in Derbyshire Dales with a recorded capacity of 2.3 MW, and has been generating since 2016-09-15.

2.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-09-15
Wind Onshore
Technology
Sibelco/ Golconda
Derbyshire Dales
Authority
England

Planning and build timeline

Application submitted2011-04-11
Permission granted2012-03-21
11 months after submission
Operational2016-09-15
54 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Derbyshire Dales’s record on onshore wind

Derbyshire Dales has decided 5 onshore wind schemes and approved 60%, taking a median of 11.3 months. See every onshore wind scheme decision in Derbyshire Dales

Other built sites within 15 km

SiteMWDistance
Ryder Point Quarry Wind Turbines
Wind Onshore · Operational
50.5 km
Carsington Pasture
Wind Onshore · Operational
80.8 km
Land at Dayfields Farm
Solar Photovoltaics · Operational
4.77.4 km
Smith Hall Farm Solar Park
Solar Photovoltaics · Operational
58.9 km
Lady Hole Farm
Solar Photovoltaics · Operational
310 km

How big is Sibelco Brassington?

Sibelco Brassington has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Sibelco Brassington?

REPD records the operator as Sibelco/ Golconda. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Sibelco Brassington approved and built?

The application was submitted on 2011-04-11. Permission was granted on 2012-03-21, 11 months later. The site became operational on 2016-09-15, 54 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3382.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council