Novarly ParcelRenewable sites

Renewable sitesHall Farm Solar Farm (Newbold Verdon)

Hall Farm Solar Farm (Newbold Verdon)

Hall Farm Solar Farm (Newbold Verdon) is operational in Hinckley and Bosworth with a recorded capacity of 5 MW, and has been generating since 2015-12-08.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-08
Solar Photovoltaics
Technology
Push Energy/ NextEnergy Solar Fund (NESF)
Hinckley and Bosworth
Authority
England

Planning and build timeline

Application submitted2014-07-17
Permission granted2015-06-03
11 months after submission
Operational2015-12-08
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Hinckley and Bosworth’s record on solar

Hinckley and Bosworth has decided 25 solar farms and approved 96%, taking a median of 3 months. See every solar farm decision in Hinckley and Bosworth

Other built sites within 15 km

SiteMWDistance
Halifax Farm
Wind Onshore · Operational
1.61.9 km
Lindridge Farm
Solar Photovoltaics · Operational
52.8 km
Desford Brick Works, Bagworth - Solar Panels
Solar Photovoltaics · Operational
2.63.5 km
Crown Farm
Solar Photovoltaics · Operational
64 km
Desford Solar Farm
Solar Photovoltaics · Operational
56.2 km
Thornton Lane
Solar Photovoltaics · Operational
2.76.4 km
Tower Hayes Farm
Solar Photovoltaics · Operational
56.5 km
Pretoria Road
Solar Photovoltaics · Operational
4.96.8 km

How big is Hall Farm Solar Farm (Newbold Verdon)?

Hall Farm Solar Farm (Newbold Verdon) has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hall Farm Solar Farm (Newbold Verdon)?

REPD records the operator as Push Energy/ NextEnergy Solar Fund (NESF). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hall Farm Solar Farm (Newbold Verdon) approved and built?

The application was submitted on 2014-07-17. Permission was granted on 2015-06-03, 11 months later. The site became operational on 2015-12-08, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1991.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council