Glen Etive Estate Phase I (Allt na Chaorainn)

Glen Etive Estate Phase I (Allt na Chaorainn) is a 1.4 MW hydro scheme under construction in Highland. Planning permission was granted on 31 August 2018, 2 months after submission. Operator of record: Dickins Hydro Resources.

1.4 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Small Hydro
Technology
Dickins Hydro Resources
Highland
Authority
Scotland

Planning and build timeline

Application submitted16 June 2018
Permission granted31 August 2018
2 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Highland: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Glen Etive Estate Phase I (Allt na Chaorainn)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Large Hydro · Operational
19.511 km
Small Hydro · Operational
212.7 km
Small Hydro · Under Construction
0.613.1 km
Small Hydro · Operational
114.1 km

How big is Glen Etive Estate Phase I (Allt na Chaorainn)?

Glen Etive Estate Phase I (Allt na Chaorainn) has a recorded installed capacity of 1.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Glen Etive Estate Phase I (Allt na Chaorainn)?

REPD records the operator as Dickins Hydro Resources. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Glen Etive Estate Phase I (Allt na Chaorainn) approved and built?

The application was submitted on 16 June 2018. Permission was granted on 31 August 2018, 2 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6675.