Gayton Le Marsh Wind Farm
Gayton Le Marsh Wind Farm is operational in East Lindsey with a recorded capacity of 16.4 MW, and has been generating since 2016-02-26.
Planning and build timeline
| Application submitted | 2011-08-15 |
| Permission granted | 2013-04-05 20 months after submission |
| Operational | 2016-02-26 35 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
East Lindsey’s record on onshore wind
East Lindsey has decided 14 onshore wind schemes and approved 50%, taking a median of 15.9 months. See every onshore wind scheme decision in East Lindsey →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Bambers II Wind Onshore · Operational | 4.6 | 6.7 km |
Bambers Farm Wind Onshore · Operational | 9.6 | 6.7 km |
High Leas Solar Photovoltaics · Operational | 6.5 | 6.7 km |
Fen Farm Solar Park Solar Photovoltaics · Operational | 1 | 9.3 km |
Fen Farm Wind Onshore · Operational | 16 | 9.3 km |
Yarburgh Grove Farm Solar Photovoltaics · Operational | 8.1 | 11 km |
How big is Gayton Le Marsh Wind Farm?
Gayton Le Marsh Wind Farm has a recorded installed capacity of 16.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Gayton Le Marsh Wind Farm?
REPD records the operator as Energiekontor UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Gayton Le Marsh Wind Farm approved and built?
The application was submitted on 2011-08-15. Permission was granted on 2013-04-05, 20 months later. The site became operational on 2016-02-26, 35 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4369.