Ewe Hill (extension) is operational in Scottish Government (S36) with a recorded capacity of 36.8 MW, and has been generating since 2017-01-15.
Planning and build timeline
| Application submitted | 2004-03-31 |
| Permission granted | 2014-05-16 121 months after submission |
| Operational | 2017-01-15 32 months after consent |
Scottish Government (S36)’s record on onshore wind
Scottish Government (S36) has decided 173 onshore wind schemes and approved 80%, taking a median of 33.7 months. See every onshore wind scheme decision in Scottish Government (S36) →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Ewe Hill Wind Onshore · Operational | 13.8 | 0 km |
Minsca Wind Onshore · Operational | 36.8 | 2.1 km |
Stevens Croft Biomass (dedicated) · Operational | 50.4 | 5.9 km |
West Roucan Farm Anaerobic Digestion · Operational | 1.2 | 12.8 km |
Crossdykes Wind Onshore · Operational | 48 | 12.8 km |
Solwaybank Wind Farm Wind Onshore · Operational | 30 | 14.5 km |
How big is Ewe Hill (extension)?
Ewe Hill (extension) has a recorded installed capacity of 36.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Ewe Hill (extension)?
REPD records the operator as Scottish Power Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Ewe Hill (extension) approved and built?
The application was submitted on 2004-03-31. Permission was granted on 2014-05-16, 121 months later. The site became operational on 2017-01-15, 32 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3627.