Renewable sitesEast Midlands Airport

East Midlands Airport

East Midlands Airport is operational in North West Leicestershire with a recorded capacity of 1 MW, and has been generating since 2011-05-10.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-05-10
Wind Onshore
Technology
Wind Direct
North West Leicestershire
Authority
England

Planning and build timeline

Application submitted2007-08-31
Permission granted2008-03-28
7 months after submission
Operational2011-05-10
37 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
East Midlands Distribution Centre
Solar Photovoltaics · Operational
6.12.9 km
Walnut Yard (Phase 1)
Solar Photovoltaics · Operational
1.83.3 km
Langley Priory, Walnut Yard (Phase 2)
Solar Photovoltaics · Operational
6.23.3 km
Land at Whatton Road
Solar Photovoltaics · Operational
1.53.8 km
Newhurst Quarry
EfW Incineration · Operational
428.8 km
Lount/Smoile
Landfill Gas · Operational
1.19.3 km
Lount solar farm
Solar Photovoltaics · Operational
2.810.2 km
Derby Sewage Treatment Works
Wind Onshore · Operational
510.3 km

How big is East Midlands Airport?

East Midlands Airport has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates East Midlands Airport?

REPD records the operator as Wind Direct. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was East Midlands Airport approved and built?

The application was submitted on 2007-08-31. Permission was granted on 2008-03-28, 7 months later. The site became operational on 2011-05-10, 37 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4113.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council