Earlsburn North (Kingsburn) Wind Farm is an operational 22.5 MW onshore wind farm in Stirling, generating since 30 May 2016. Planning permission was granted on 1 April 2010, 26 months after submission. Operator of record: Falck Renewables.
Planning and build timeline
| Application submitted | 8 February 2008 |
| Permission granted | 1 April 2010 26 months after submission |
| Operational | 30 May 2016 74 months after consent |
Screening a site of your own?
Stirling approves 64% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Earlsburn North (Kingsburn) Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
Stirling’s record on onshore wind
Stirling has decided 11 onshore wind schemes and approved 64%, taking a median of 14.4 months. See every onshore wind scheme decision in Stirling →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 37.5 | 2.7 km |
Wind Onshore · Operational | 1.5 | 5.9 km |
Wind Onshore · Operational | 20 | 6 km |
How big is Earlsburn North (Kingsburn) Wind Farm?
Earlsburn North (Kingsburn) Wind Farm has a recorded installed capacity of 22.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Earlsburn North (Kingsburn) Wind Farm?
REPD records the operator as Falck Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Earlsburn North (Kingsburn) Wind Farm approved and built?
The application was submitted on 8 February 2008. Permission was granted on 1 April 2010, 26 months later. The site became operational on 30 May 2016, 74 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4247.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode