Earlsburn North (Kingsburn) Wind Farm is an operational 22.5 MW onshore wind farm in Stirling, generating since 30 May 2016. Planning permission was granted on 1 April 2010, 26 months after submission. Operator of record: Falck Renewables.

22.5 MW
Capacity
as recorded in REPD
Operational
Status
since 30 May 2016
Wind Onshore
Technology
Falck Renewables
Stirling
Authority
Scotland

Planning and build timeline

Application submitted8 February 2008
Permission granted1 April 2010
26 months after submission
Operational30 May 2016
74 months after consent

Screening a site of your own?

RedlineUK · £39

Stirling approves 64% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Earlsburn North (Kingsburn) Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Stirling’s record on onshore wind

Stirling has decided 11 onshore wind schemes and approved 64%, taking a median of 14.4 months. See every onshore wind scheme decision in Stirling

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
37.52.7 km
Wind Onshore · Operational
1.55.9 km
Wind Onshore · Operational
206 km

How big is Earlsburn North (Kingsburn) Wind Farm?

Earlsburn North (Kingsburn) Wind Farm has a recorded installed capacity of 22.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Earlsburn North (Kingsburn) Wind Farm?

REPD records the operator as Falck Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Earlsburn North (Kingsburn) Wind Farm approved and built?

The application was submitted on 8 February 2008. Permission was granted on 1 April 2010, 26 months later. The site became operational on 30 May 2016, 74 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4247.