Dyffryn Brodyn Wind Farm is an operational 5.5 MW onshore wind farm in Carmarthenshire, generating since 1 December 1994. Planning permission was granted on 1 January 1994. Operator of record: Renewable Energy Systems (RES).

5.5 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 1994
Wind Onshore
Technology
Renewable Energy Systems (RES)
Carmarthenshire
Authority
Wales

Planning and build timeline

Application submittednot recorded
Permission granted1 January 1994
Operational1 December 1994
11 months after consent

Screening a site of your own?

RedlineUK · £39

Carmarthenshire approves 70% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Dyffryn Brodyn Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Carmarthenshire’s record on onshore wind

Carmarthenshire has decided 10 onshore wind schemes and approved 70%, taking a median of 11.7 months. See every onshore wind scheme decision in Carmarthenshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
189.7 km
Solar Photovoltaics · Operational
114 km
Wind Onshore · Operational
3.914 km

How big is Dyffryn Brodyn Wind Farm?

Dyffryn Brodyn Wind Farm has a recorded installed capacity of 5.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dyffryn Brodyn Wind Farm?

REPD records the operator as Renewable Energy Systems (RES). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dyffryn Brodyn Wind Farm approved and built?

REPD does not record a submission date. Permission was granted on 1 January 1994. The site became operational on 1 December 1994, 11 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2956.