Anaerobic Digestion Plant
Anaerobic Digestion Plant is operational in Armagh City, Banbridge and Craigavon with a recorded capacity of 0.5 MW.
Planning and build timeline
| Application submitted | 2018-01-22 |
| Permission granted | not recorded |
| Operational | not recorded |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Portadown Road Battery · Under Construction | 50 | 10.8 km |
Gilford Road Solar Photovoltaics · Operational | 1.3 | 11.1 km |
Dungannon Energy Storage System Battery · Under Construction | 50 | 13.4 km |
How big is Anaerobic Digestion Plant?
Anaerobic Digestion Plant has a recorded installed capacity of 0.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Anaerobic Digestion Plant?
REPD records the operator as Hewitt Meats. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Anaerobic Digestion Plant approved and built?
The application was submitted on 2018-01-22. REPD does not record a grant date. REPD does not record an operational date.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11234.