Novarly ParcelRenewable sites

Renewable sitesAnaerobic Digestion Plant

Anaerobic Digestion Plant

Anaerobic Digestion Plant is an operational 0.5 MW anaerobic digestion plant in Armagh City, Banbridge and Craigavon. REPD does not record the planning grant date. Operator of record: Hewitt Meats.

0.5 MW
Capacity
as recorded in REPD
Operational
Status
no operational date
Anaerobic Digestion
Technology
Hewitt Meats
Armagh City, Banbridge and Craigavon
Authority
Northern Ireland

Planning and build timeline

Application submitted22 January 2018
Permission grantednot recorded
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Armagh City, Banbridge and Craigavon: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Anaerobic Digestion Plant’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
5010.8 km
Solar Photovoltaics · Operational
1.311.1 km
Battery · Under Construction
5013.4 km

How big is Anaerobic Digestion Plant?

Anaerobic Digestion Plant has a recorded installed capacity of 0.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Anaerobic Digestion Plant?

REPD records the operator as Hewitt Meats. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Anaerobic Digestion Plant approved and built?

The application was submitted on 22 January 2018. REPD does not record a grant date. REPD does not record an operational date.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11234.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode