Renewable sites › Crockbaravally Wind Farm
Crockbaravally Wind Farm
Crockbaravally Wind Farm is an operational 7.5 MW onshore wind farm in Fermanagh and Omagh, generating since 24 February 2017. Planning permission was granted on 5 March 2012, 38 months after submission. Operator of record: Golden Square Energy.
Planning and build timeline
| Application submitted | 2 January 2009 |
| Permission granted | 5 March 2012 38 months after submission |
| Operational | 24 February 2017 60 months after consent |
Screening a site of your own?
Fermanagh and Omagh approves 92% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Crockbaravally Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
Fermanagh and Omagh’s record on onshore wind
Fermanagh and Omagh has decided 66 onshore wind schemes and approved 92%, taking a median of 20.9 months. See every onshore wind scheme decision in Fermanagh and Omagh →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 12.5 | 1.8 km |
Wind Onshore · Operational | 15 | 2 km |
Wind Onshore · Operational | 15 | 2.1 km |
Wind Onshore · Operational | 2.5 | 2.5 km |
Wind Onshore · Operational | 13.8 | 2.9 km |
Wind Onshore · Operational | 7.1 | 4.6 km |
Wind Onshore · Operational | 7.1 | 6.1 km |
Wind Onshore · Operational | 18.8 | 6.2 km |
How big is Crockbaravally Wind Farm?
Crockbaravally Wind Farm has a recorded installed capacity of 7.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Crockbaravally Wind Farm?
REPD records the operator as Golden Square Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Crockbaravally Wind Farm approved and built?
The application was submitted on 2 January 2009. Permission was granted on 5 March 2012, 38 months later. The site became operational on 24 February 2017, 60 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4255.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode